Reference Letter


 

 

Jeddah_dam_BC40---COW-construction

 

Luis Melo de Sampaio, Contractor´s Representative, Andrade Gutierrez, about the Jannah Dam and Lake Works Phase II – New Dam

The professional way in which the BAUER team prepared and executed the works was very well received. Trial mixes and generally quality management and control along the detailed method statement secured the highest standards of quality for the product.
The work carried out in constructing the Diaphragm Walls in the Republic of Lebanon was very professional.
When there were issues or questions related to the particular works, BAUER was proactive in seeking a solution and correcting the problem or answering the questions. 1 also note that the issues were few and infrequent.
BAUER's professional approach towards Health Safety Environment (HSE) was excellent. The project was executed within the agreed schedule but even less.

Reference Letter

 

 

 

Joseph Abou Mansour, BATCO-Group, Area-Manager, about the Mseilha Project - Execkution of Cut-Off-Wall

Scope of Work:

10.500 m² cut-off wall with  a nominal thickness of 1.0 m

The works were in so far not routine as it was the first cut-off wall on dams, the first ever cutter-excavated diaphragm wall and the first plastic concrete application in specialized geotechnical works in the country.


The compliance with contractual terms/provisions was exceptional


Overall rating for the work performed by BAUER Lebanon: exceptional

Reference Letter

 

 

 

Robert Emery, Project Manager, Egyptian – French New Assiut Barrage Joint Venture (EFNAB JV), about the New Assiut Barrage Project - New Dam

Main Scope of Work:
  • Construction of temporary single phase slurry cut-off-wall - 58,632.00 M2
  • Construction of Diaphragm Walls - 18,242.00 M2
  • Construction of two phase slurry cutt-off-wall - 28,931.00 M2
  • Construction of Bored Pile walls - 7,154.00 LM

We hereby certify that the above cited scope of the Works have been substantially completed and passed all tests under the contract, in compliance with the provisions of the Contract.

 Reference letter

     

 
 

Zeki Yilmaz, Deputy Project Manager, AGE Batum Limited Liability Company, about the Skhalta Dam Project - New Dam

"Following the successful completion of BAUER's part of the project, I would like to express my appreciation for the means and methods in which BAUER has performed on the project. The professional way in which the BAUER team prepared and executed the works was very well received. Trial mixes and generally quality management and control along the detailed method statement secured the highest standards of quality for the product. The work caried."


 Reference letter
     
 

Wang Peng, Project Manager, China International Water & Electric Corp. (CWE), about the Bagatelle Dam Project - New Dam

"Following the successful completion of Bauer´s ρortion of the ρroject, we would like to express our apρreciation for the way in which Bauer has performed on the ρroject. Once on site, the ρrofessional way in which the Bauer site team went about setting up the work site was very well received.  The quality of the work was first class and acceρted by the Engineer."

 Reference letter
     
   

K.K. Sood, Project Manager, Jaiprakash Associates Limited, about the Punatsangchhu-II Hydroelectric Project - New Dam

"M/s BAUER were equipped with all professional ways for the team preparedness and work execution and proactive in seeking a quick solutions for the site issues, maintaining highest standards of quality for the product and the professional approach towards health, safety and environment (HSE) was excellent."

 Reference letter
     
 

Sebastian Fritze, Branch Manager, Landestalsperrenverwaltung des Freistaates Sachsen (Federal state reservoir authority of the free state of Saxony), about the Flood Control Reservoir Rennersdorf Project - Rehabilitation and Upgrade

"After the successful completion of BAUER Spezialtiefbau GmbH´s works we would like to express our gratefulness and appreciation for the services rendered. BAUER executed the above mentioned works absolutely perfectly and to our full satisfaction."

Reference letter
     
 

Harish Aggarwal, Senior General Manager, Jaiprakash Associates Limited, about the Mangdechhu Hydroelectric Power Plant Project - New Dam

"BAUER was equipped with all professional ways for team preparedness and work execution and proactive in seeking a quick solutions for the site issues, maintaining highest standards of quality for the product and professional approach towards Health, Safety & Environment (HSE) was excellent.
The project was executed within the agreed schedule."

Reference letter

     
 

Julio Lopes Ramos, Contract Director, Odebrecht, about the Daule-Vinces Water Transfer Project (DAUVIN) - New Dam

"The BAUER team mobilized to the site prepared and executed the works with a thorough understanding of their trade. Trial mixes and proper quality management and control according with the detailed method statement helped attain the required standards for the finished product. The work was carried out in a professional and satisfactory manner, according to specifications and within the contract´s scope and term."

Reference letter
     
 

Ricardo Vieira, Contract Director, Odebrecht, about the Installation of a Single Phase Bentonite-Cement Cut-off Wall at the San Vicente Dam Project - Rehabilitation and Upgrade

"The BAUER team mobilized to the site prepared and executed the works with a thorough understanding of their trade. Trial mixes and proper quality management and control according with the detailed method statement helped attain the required standards for the finished product. The work was carried out in a professional and satisfactory manner, according to specifications and within the contract´s scope and term."

Reference letter
     
 

Michel Dubois, Project Director from SNC-Lavalin Angola Lda. about the Matala Dam Rehabilitation Project - Rehabilitation and Upgrade

"This letter is to confirm that from the 20th of July to the 30th of October 2012, the company BAUER Angola Lda. has executed and successfully completed the contract signed with SNC-Lavalin Angola Lda. regarding the construction of a slurry cut-off wall for the Matala Dam Rehabilitation Project."

Reference letter
     
 

Bernhard Lederer, Bauoberrat (Responsible Authority) from Bayerischen Staatsministerium für Umwelt und Gesundheit about the Sylvenstein Dam Project - Rehabilitation and Upgrade

"Following the successful completion of BAUER´s part of the project, we would like to express our perfect satisfaction with the means and methods in which BAUER has performed on the project."

Reference letter

 

     
 

K. K. Gupta, Project Director from Larsen & Toubro Limited about the Punatsangchhu-I Hydroelectric Project - New Dam

"The general quality management and control along the detailed method statement secured the highest standards of quality for the final product and technical issues related to the execution of this Project were attended by BAUER proactively."

Reference letter
     
 

Peter Kinsella, Construction Manager from Thiess Pty Ltd about the Hinze Dam Upgrade - Rehabilitation and Upgrade

"I congratulate you and your team on the completion of a successful and very professionally run project."

Reference letter
 
     
 

Prof. (em.) Dr.-Ing. Theodor Strobl, Head of Panel of Experts for Wadi Dayqah Dams - New Dam

"Following the successful completion of the project of the Ministry of Regional Municipalities and Water Resources as head of the Panel of Experts, engaged for the project of building a reservoir with a RCC Dam and an Embankment Dam of each 75 m height under partly very difficult underground conditions. I would like to express my appreciation for the means and methods in which BAUER has performed on the project."

Reference letter

 

     
    

Richard Boudreau, Principal Director – Production Projects, Hydro-Québec Equipment and SEBJ, about Peribonka Dam Project - New Dam

"It means a lot to me to say thank you to the teams of Hydro-Québec, SNC Lavalin and Bauer. Because of the fusion of their energy, know-how and skills the works were completed in excellent quality within the given time frame. After completion of this successful phase now, we can begin with the construction of the dam so that the filling of the basin can be started as planned in autumn 2007. Congratulations!"

Reference letter

     
chabrouh_dam_295x221  

Charles Edde, Director, Ste. Mouawad-Edde, about the extensive drilling and grouting works at the Chabrouh Dam Project - New Dam

"Bauer reacted flexibly regarding design changes and contributed in a professional way to further mix design and execution technique improvements based on their extensive experience acquired in similar projects. Their team was always proactive in seeking solutions for unforeseen problems. In conclusion, Bauer's professional approach towards the project was to our fullest satisfaction with respect to the excellent quality, the construction schedule and the cooperation with the involved Parties."

Reference letter

     
 

Egon Failer, Executive Director, Lahmeyer International GmbH, about New Naga Hammadi Barrage Project - New Dam

"In conclusion, Bauer´s professional approach towards the project was excellent. The project was executed within the agreed schedule and even partly ahead of schedule."

Reference letter

     
 

K. Sheibani, Karkheh & Gotvand Dams Project Manager, about Karkheh Dam Project - New Dam

"For the fulfilment of the above criteria in the best possible form, BAUER Spezialtiefbau GmbH, has utilized its professional and delicate management attitude, support and efforts, which has brought excellent achievements for both Companies i.e. completion of approximately 450.000 m2 of Cut-Off-Wall in both a/m projects in accordance with global technical standards."

Reference letter